Intermittent Bonded Ribbon Production Line Available For Sale
A specified speed of 600 m/min gives this equipment considerable production capacity for optical-fiber applications. Before making purchasing plans, buyers should verify the actual speed, configuration, and operating conditions with the manufacturer.
Shanghai Weiye OFC supplies equipment designed specifically for producing rollable ribbons containing 12 or 16 fibers. Its product description presents the equipment’s capabilities, technical specifications, and included systems, providing U.S. buyers with a basis for comparing their equipment requirements.
Begin by examining the stated equipment configuration, then ask the supplier for pricing, installation requirements, and project-specific alternatives. This approach helps determine which equipment details apply to your particular manufacturing site and goals.
The listed address for Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. is 201 Minyi Road, Songjiang District, Shanghai. Use the product page for initial reference and verify current technical and commercial information directly with the company. Submitting a clear request for pricing and specifications can help you move forward with the assessment.
Fiber Cable Sheathing Line Compact Fiber Unit Fiber Draw Tower
Key Takeaways
- The stated operating speed is 600 m/min, although the manufacturer should confirm the applicable conditions.
- This equipment supports production of 12-fiber and 16-fiber rollable ribbon formats.
- The product listing describes machine capabilities, technical specifications, and supplied systems.
- Request details about pricing, installation requirements, and project-specific customization.
- The supplier provides a business address in Songjiang District, Shanghai.
Overview Of The Intermittent Bonded Ribbon Production Line
The manufacturer identifies this machinery as suitable for 12- and 16-fiber rollable IBR formats. Its product page specifies a construction speed of 600 m/min and a fiber diameter of Ф245 μm ±10 μm. As these are manufacturer-listed values, confirm the actual production speed and relevant operating requirements directly with the supplier.
Intermittent Bonded Ribbon Production Line
Designed To Produce Twelve- And Sixteen-Fiber Rollable Ribbons
Two fiber-count options are supported by the configuration for manufacturing rollable ribbons. This provides a useful reference when buyers compare machinery against their required ribbon format, fiber dimensions, and material-handling arrangements.
How Intermittent Adhesive Bonding Allows Flexible Fiber Configurations
According to examples in the patent, fibers are arranged in adjacent subunits with adhesive connections applied periodically. One illustrated spacing range extends from 10 mm to 1,000 mm. Unlike continuous bonding, this arrangement does not join the fibers along their entire length.
By spacing the bonds apart, the assembly can move between a mostly planar arrangement and a rolled, curled, or folded shape. The specified spacing illustrates the patented design concept rather than confirmed production-machine settings.
- Machine details: 12 or 16 fibers, a stated speed of 600 m/min, and a diameter of Ф245 μm ±10 μm.
- Patent example: Illustrative spacing between adhesive bonds of 10 mm to 1,000 mm.
- Design benefit: Flexible handling across several possible shapes.
Applications In Optical Fiber Cable Manufacturing
Adjustable fiber layouts may allow cable designers to combine convenient splice access with space-efficient packaging. The patent outlines a configuration that maintains fiber organization while allowing portions to move between adhesive connection points during cable assembly.
Compact Cable Designs And High Fiber Density
An optical fiber ribbon may remain flat during mass fusion splicing and subsequently fold or roll for installation in a smaller cable. Potential advantages described in the patent include smaller cable constructions and an increased ratio of fiber area to overall cable cross-sectional area. Actual performance and dimensions will vary according to the overall cable design and the application for which it is intended.
Organizing Fiber Ribbons To Support Efficient Fusion Splicing
The ribbon format enables organized handling at the splice location while allowing the subunits to move during cable assembly. For production material planning, the listed specifications include payoff reels accommodating 25.2 km and 50.4 km of fiber. These reel capacities can be compared with the facility’s cable-manufacturing needs and material-handling setup.
| Design characteristic | Potential use | Consideration for buyers |
|---|---|---|
| Flat fiber configuration | Mass fusion splicing | Verify the needs of your splicing process |
| Folded or rolled format | Space-efficient cable packaging | Examine the complete cable design |
| 25.2 km and 50.4 km capacity payoff reels | Material-handling preparation | Match the reel capacity to production operations |
Specifications And Performance Of The Production Line
Compare the equipment’s published performance figures with your manufacturing requirements before requesting a quotation. Reel compatibility and facility utility requirements are also important considerations for installation planning.
Speed, Diameter, And Attenuation
According to the specifications, the construction speed reaches 600 m/min. The specified fiber diameter is Ф245 μm ±10 μm, while additional attenuation is stated as ≤0.01 dB/km at 1550 nm. Confirm the measurement conditions and expected performance directly with the manufacturer.
Compatibility With Payoff And Take-Up Reels
The payoff system accommodates two reel dimensions, and the maximum weight of a full reel is 10 kg. The take-up assembly supports a T-type reel as well as a fiber-optic reel. Verify that your selected reel configuration is compatible with the facility’s material-handling process.
Facility Utilities And Operating Environment
Plan for a 380 V ±10% power connection using a three-phase, five-wire system. Its specified operating environment is enclosed, clean, dry, and protected from drafts, with temperatures of 15 to 25°C and relative humidity no higher than 85%. Nitrogen must be supplied at 7 bar with 99.99% purity, together with compressed air at 6 bar. Verify the required utility connections before installation begins.
| Technical specification | Listed requirement | Planning note |
|---|---|---|
| Reels for fiber payoff | Payoff dimensions of Ф236 × Ф25.4 × 108 mm or Ф267 × Ф25.4 × 180 mm; full reel ≤10 kg | Verify reel dimensions and weight |
| Reel used for take-up | T-type dimensions of Φ410 × Φ50.8 × 391 mm, or a fiber-optic reel | Confirm compatibility with your selected format |
| Electrical and environmental requirements | Power supply of 380 V ±10%; temperature of 15 to 25°C; humidity ≤85% | Provide a clean, dry area without drafts |
| Gas utility supply | Nitrogen: 7 bar, 99.99% purity; air: 6 bar | Verify gas supply capacity before installation |
Fiber Payoff And Gathering Equipment
The payoff and gathering assemblies direct optical fibers into the ribbon-forming area. The associated controls help maintain a steady supply of fiber while reducing handling risks.
Tension-Controlled Payoff System For Sixteen Spools
The payoff assembly holds 16 spools and provides traversing along with separately adjustable tension settings. The permitted weight for an individual spool is up to 10 kg. Detailed specifications indicate a tension range of 0.4 to 2 N, accuracy of ±0.02 N, and a 550 W motor. Another overview gives a range of 40 to 150 g and accuracy of ±2 g, so buyers should confirm which specification applies to their configuration.
Fiber Guiding, Break Detection, And Electrostatic Control
The forming area receives fibers through U-groove guides, multi-groove gathering rollers, and devices designed to prevent jumping. A break-detection system and alarms notify operators when problems occur. Safe handling is supported by protective guards and a pneumatic clamping mechanism. A rod-type electrostatic dust collector is positioned at the fiber exit, and additional anti-static devices help control dust throughout the gathering path.
| Equipment component | Listed detail | Purpose |
|---|---|---|
| Fiber payoff assembly | Capacity for 16 spools, each weighing up to 10 kg | Supplies fibers using traversing |
| Tension and motor | 0.4 to 2 N with ±0.02 N accuracy; 550 W | Supports regulated payoff of fibers |
| Fiber guidance and safety features | Rollers with grooves, warning alarms, protective guards, and a pneumatic clamp | Directs fibers and supports safe handling |
| Electrostatic management | Rod-style electrostatic collector with anti-static devices | Helps reduce dust near fiber routes |
Intermittent Adhesive Dispensing And Precision Molding
The ribbon-forming platform allows operators to control the mold position and placement of adhesive. These settings allow the production process to be adapted to the intended ribbon configuration.
Adjustable IBR Mold Platform For Ribbon Formation
Three mold sets are provided for ribbon formation, and each accommodates as many as five Nordson EFD jet valves. Operators can position the mold within 0 to 15 mm and adjust its base temperature from 20°C to 60°C. Grouped precision dispensing valves are installed on slide tables so operators can refine their alignment and place adhesive dots carefully.
Adjustable Nozzle Configurations For Twelve- And Sixteen-Fiber Ribbon Production
The 12-fiber configuration employs a 5+5+1 valve arrangement. The 16-fiber format is produced using a 5+5+5 valve layout. The control interface enables changes to dot count and spacing according to the ribbon configuration being manufactured. The process calls for a specialized adhesive suitable for both coating and curing.
| Process setting | Format With 12 Fibers | Format With 16 Fibers |
|---|---|---|
| Dispensing valve layout | Valve arrangement of 5+5+1 | 5+5+5 valve configuration |
| Mold positioning range | 0 to 15 mm adjustment | 0 to 15 mm adjustment |
| Temperature of the mold base | Temperature range of 20°C to 60°C | Temperature range of 20°C to 60°C |
UV-LED Curing For Bonded Fiber Ribbons
The curing assembly applies UV exposure in stages to harden adhesive throughout the fiber structure. Prospective buyers can assess the oven configuration and listed operating specifications to determine whether the equipment suits their production process.
Pre-Curing And Main Curing Stages
Three dedicated LED-UV ovens rated at 800 W each perform the pre-curing operation. Each oven processes fibers supplied by a separate mold group before the material reaches the main 6 kW post-curing oven. Adjustable shutters reduce potential UV leakage and nitrogen loss. The supplier states a principal wavelength of 395 nm ±3 nm, minimum curing degree of 85%, and post-curing power of no less than 2.5 kW.
Managing Nitrogen Supply And Curing Performance
The nitrogen flow rate and pressure can be adjusted by hand. Automatic functions also start nitrogen delivery during startup and stop it at shutdown. The manufacturer states that lamp-array power use remains at or below 80% of total power during steady, continuous operation at production speed. The figures are useful for initial equipment assessment, but buyers should confirm the conditions under which they were measured. Discuss how the operating settings may change depending on the adhesive and materials selected.
Visual Monitoring, Capstan, And Take-Up
As fibers travel through the equipment, visual monitoring and steady winding support the maintenance of material quality. Buyers can use the listed specifications to assess whether the machine meets the demands of their cable manufacturing process.
Real-Time Inspection Of Fiber Colors And Adhesive Dot Placement
A microscope and camera provide enlarged images in real time. The display allows operators to check the sequence of fiber colors and confirm adhesive resin dots at each dispensing position. By examining the optical fiber ribbon during production, operators can detect potential issues ahead of winding.
Servo-Driven Traction And Precision Take-Up
A 1 kW AC servo motor powers the capstan’s Φ190 mm traction wheel. The listed measurement accuracy exceeds 1‰. The adjustable tension range is 50 to 500 g, with control accuracy of ±5 g. These operating parameters help maintain careful fiber-ribbon handling as the material advances through the line.
The specified take-up speed is 600 m/min, and the maximum spool weight is 30 kg. Servo-controlled winding and traversing systems help maintain consistent material placement. Cable pitch can be adjusted continuously between 1 and 6 mm. Position detection and direction changes are supported by a photoelectric sensor. Confirm that the operating conditions and settings are suitable for your target cable design with the supplier.
Electrical Controls And Production Monitoring
Accessible controls allow operators to adjust settings, check equipment status, and arrange orderly shutdowns. The supplier identifies Siemens control equipment and Schneider Electric switchgear as components of the production line.
Operating The Production Line Through PLC And Touchscreen Controls
The ribbon production line uses Siemens S7-1200 and S7-1500 PLCs with a 10.4-inch Siemens touchscreen interface. Schneider Electric provides the low-voltage switching equipment. The system supports both interlocked operation across the full production line and separate operation of individual units.
Process Settings, Warning Alarms, And Preset-Length Shutdowns
Through the touchscreen, operators can manage process settings, activate curing ovens, configure wire feeding, and view alarms. Additional displays provide lamp runtime, real-time current readings, curing-oven temperature, and total machine operating hours. The meter-counter calibration feature allows displayed counts to be aligned with the distance actually traveled.
A preset length can be entered to initiate slowing or stopping of the machine. The function supports managed stopping as a cable manufacturing run reaches its planned length. Ask the manufacturer to confirm control capabilities and setup requirements before placing an order.
| Control-system feature | Listed detail | Use |
|---|---|---|
| PLC and display | Siemens S7-1200 and S7-1500 PLCs with a 10.4-inch touchscreen | Adjust and review operating information |
| Electrical components | Low-voltage switchgear from Schneider Electric | Provides support for system control |
| Equipment monitoring and shutdown control | Lamp, oven, runtime, and meter information with preset length | Monitor production and stop or decelerate the equipment |
Materials, Process Compatibility, And Ribbon Quality
The selected adhesive influences coating uniformity and the quality of the finished ribbon. Rather than recommending a general adhesive, the supplier specifies a formulation dedicated to the equipment’s coating and curing operations.
Specialized Adhesive Used For Bonding And Curing
Separate valve switches on the pressurized adhesive supply let operators control individual feed paths. Precision pressure-regulating valves help maintain controlled adhesive delivery at each dispensing location. Air pressure can be regulated but must remain at or above the listed minimum of 0.5 MPa.
Black adhesive supply tubing helps protect the material from reactions caused by UV exposure during operation and curing. This protection is important because premature exposure may change adhesive properties before application to the fiber.
Confirm suitable adhesives, process parameters, and surface-finish requirements with the manufacturer before choosing materials for a secondary coating operation. Discuss the material’s expected performance across your planned application and run duration. Detailed manufacturing guidance can support consistent quality throughout setup and the completed run.
Installation Requirements And Included Documentation
Ensure the workspace and utility supplies are ready before scheduling the machine’s installation. The supplier’s specifications provide guidance for planning the production site and supporting consistent operation of the fiber-optic machinery.
Required Facility Conditions And Connections Provided By The Buyer
Install the machinery in a clean, dry, enclosed environment protected from drafts. Keep the operating area between 15 and 25°C, with humidity at or below 85%. The installation also requires nitrogen supplied at 7 bar with 99.99% purity and an air supply rated at 6 bar.
The equipment package does not include connecting cables or cable trays. The purchaser is responsible for supplying the main incoming power cable. Before installation, check cable routing and utility capacity, particularly when the machine will be located near secondary coating operations.
Documentation For Operation, Installation, And Maintenance
The supplier includes documentation supporting machine installation, operation, and servicing. Inspect the supplied documentation before commissioning so personnel can organize tasks and obtain required materials.
- Instruction manuals, operating guides, and a general layout drawing
- Electrical schematics, wiring diagrams, and drawings for installation and maintenance
- Purchased-component instructions and a wear-parts list to support service preparation
These documents help maintenance and production teams prepare for initial startup and regular equipment care.
Choosing A Ribbon Production Line For Your Manufacturing Needs
Begin by identifying the ribbon formats you intend to manufacture and sell. The machinery supports 12F and 16F formats and has a stated construction speed of 600 m/min. Compare those specifications with your expected product mix, production targets, and anticipated cable demand.
Verify take-up reel compatibility before placing an equipment order. The standard IBR reel has dimensions of Φ410 × Φ50.8 × 390 × Φ310 mm, supports up to 30 kg, and provides cable pitch adjustment from 1 to 6 mm. Check that these specifications suit your production facility and material-handling operations.
The compatibility of payoff spools should be reviewed as well. Available options include international-standard spools accommodating 25.2 km, 50.4 km, and 63 km. Request precise reel measurements before selecting materials or determining production run lengths.
In addition to speed, consider power and gas utilities, suitable adhesives, and the available monitoring functions. For cable manufacturing, determine whether the configuration suits fiber cable, loose tube, or another planned application. Before ordering, review equipment configuration and startup requirements directly with Shanghai Weiye. Checking equipment suitability in advance can reduce the likelihood of costly changes after purchase.
| Planning point | Manufacturer-listed specification | Required buyer verification |
|---|---|---|
| Formats and speed | 12F, 16F; specified speed of 600 m/min | Match the specifications to manufacturing goals and product range |
| Take-up configuration | Maximum 30 kg; cable pitch of 1 to 6 mm | Verify that the reel and site arrangements are suitable |
| Fiber payoff reel options | Capacities of 25.2 km, 50.4 km, and 63 km | Confirm the precise reel measurements |
Request A Quote For The Intermittent Bonded Ribbon Production Line
U.S. buyers can evaluate a system offering 12F and 16F formats, a specified construction rate of 600 m/min, and specialized optical fiber ribbon-forming equipment. Compare these features with your planned cable products to assess equipment suitability.
A pricing inquiry should include your chosen format, projected production quantity, reel requirements, and facility utility details. Include information about the fibers and material-handling process to allow Shanghai Weiye to review the intended setup.
Confirm the suitability of the adhesive, the LED wavelength specification of 395 nm ±3 nm, and expected curing results before purchasing. Discuss how the stated specifications affect your intended material and finished surface-quality objectives.
Consult the product page for the published equipment description. Verify the final configuration, shipment details, and installation commissioning with Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. The company’s listed address is 201 Minyi Road, Songjiang District, Shanghai. You can call 021-60701630 to review your project needs with the supplier. Providing complete information in your quote request makes the following stages easier to clarify.
